Equipment selection · Line planning · Raw materials · Process supportsales@lumeigroup.com
Forming equipment

Single head fully automatic propulsion machine (20–22 stations)

Designed for molding 305–405 resin grinding wheels.

MANUFACTURING SUPPORT

Equipment configuration and manufacturing support

20–22 workstations · 305–405 products · resin grinding wheel molding configuration

Discuss this requirement
Single head fully automatic propulsion machine (20–22 stations) — equipment photograph

Equipment overview and specifications

Models, images and configurations are subject to the latest equipment specifications. Please confirm the details with your account manager.

ItemDetails
Equipment nameSingle head fully automatic propulsion machine
Model and configuration20–22 workstations · 305–405 products · resin grinding wheel molding configuration
Product range305–405 mm
Workstations20–22
Reference output300–350 pcs/h
Output conditionsQualified raw materials; total line output depends on supporting equipment and process conditions

Main components and brands

Models, images and configurations are subject to the latest equipment specifications. Please confirm the details with your account manager.

ComponentBrochure brand or sourceFunction
PressFoshan, GuangdongApplies forming pressure
PLCXinjie / Mitsubishi / SiemensControls the operating sequence
Touch screenXinjie / Mitsubishi / SiemensDisplays operating status and settings
ContactorXinjie / Mitsubishi / SiemensSwitches electrical circuits
InverterDelta / Mitsubishi / SiemensAdjusts motor speed
Servo motorXinjie / Mitsubishi / SiemensDrives controlled motion
RelayOmronSwitches control signals
Stepper motorMiGProvides stepwise positioning
Rotary table motorObonDrives the rotary table
Cylinder / valveAirtac / SMC / CKDProvides pneumatic movement and air control
Electric cylinderNewland / HongshengProvides linear motion

Information for machine selection

Provide disc diameter, thickness, bore, reinforcement structure, shifts and target output. For replacements, include installed machines and tooling. New projects require coordinated mixing, curing, testing and packing decisions.

Installation training and support

After project confirmation, review layout, installation readiness, operator training and support. Onsite charges, warranty scope and fault response follow the service terms.

Tell us about your manufacturing requirements

Discuss equipment, materials, process and delivery scope.

Submit project requirements →
Contact an account manager · WhatsApp